Case

Wilhelminaplein — Emission-Free Square Renovation

In 2025 and 2026, Heijmans is carrying out a major renovation of the Wilhelminaplein on behalf of the municipality of Eindhoven: new paving, modern sewage infrastructure, and high-quality street furniture. The site is located in the heart of the city, directly adjacent to restaurants, shops, and a busy public transport hub. Heijmans deployed multiple electric machines on this project.

The project served as a demonstration pilot for emission-free work in an inner-city environment.

Unitial’s approach

Unitial supplied a Smart Box that powers Heijmans’ construction site.

Key points:

  • Real-time monitoring of energy consumption per machine via the Energy dashboard
  • Smart charging planning, optimal distribution to avoid grid peak loads
  • Alerting, users received notifications when residual current devices or circuit breakers tripped
  • Pilot Dynamic load balancing. The Smart Box actively monitors the grid connection and ensures capacity is never exceeded through Dynamic load balancing.

Unitial Smart Box in Pattonlaan

Book a demo

Leave your details and we will contact you as soon as possible to schedule a no-obligation demo.

(optional)
(optional)